View of the western section of the new runway looking east. Griffin Road and the Greenbelt are on the right side of the photo. March 28, 2013
Structure Aerial View Feb 2013 Small Aerial view of the structures for the South Runway. February 10, 2013.
Retaining Wall Aerial Eastern View February 2013 Small Aerial view of the retaining wall's eastern end of the new South Runway. February 10, 2013.
Eastern view of the new South Runway Aerial view of the eastern section of the South Runway. The new retaining wall on the north side rises and the increased height of fill. January 12, 2013.
Construction of structures Construction of the structures with the completed walls in the background and the pilings in the foreground. January 11, 2012.
Eastern view of the retaining wall. December 12, 2012.
Artist drawing of the new Terminal 4 west phase Artist drawing of the new Terminal 4 west phase.
Excavator unloading the crushed limestone for the South Runway. About 7,000,000 cubic yards of fill will be needed.
West view of the rail spur The new FEC rail spur is almost one mile longon South Perimeter Road. This train is hauling crushed limestone.
Rail spur on Perimeter Road hauling stone to finish the spur In late July, two trains per day with 80 cars per train will haul fill for the south runway.
Aerial Looking West from 7th Avenue June 11, 2012 view looking west from 7th Avene.
Test Piles for the runway structures Test piles for the runway structures looking east.
Aerial Looking Southeast Preparing the site for the structures looking southeast with Federal Highway.
Construction site look east Looking directly east with Federal Highway in the upper portion of the photo.
Pile Driving Pile driving for the foundations of the structures over Federal Highway and the FEC Railroad tracks.
Storm Water Retention Pond Creating a storm water holding pond.
Clearing of the 10th Street extension looking west.
Looking west from 7th Avenue with the airport at the top of the photo.
Mulch being loaded in dump truck for 10th Street Extension Mulch from the clearing of vegetation for the 10th Street Extension.
Clearing of vegetation for 10th Street looking west 10th Street Extension cleared of vegetation looking west from 7th Avenue.
Storm water pond construction Removing dirt to construct a temporary storm water holding area for the South Runway Expansion.
Aerial perspective of the bridge structures over Federal Highway and the FEC Railroad. Aerial perspective of the bridge structures over Federal Highway and the FEC Railroad.
Northeastern view of the expanded South Runway with the bridge structures.
Panorama of the expanded south runway looking east towards the ocean. Panorama of the expanded south runway looking east towards the ocean.
Aerial picture of the expanded South Runway showing the retaining wall of the eastern sections. Aerial picture of the expanded South Runway showing the retaining wall of the eastern sections.