• General overall site showing the southwest, northwest and northeast quadrants.
    General overall site showing the southwest, northwest and northeast quadrants.
  • Northwest quadrant where concrete columns and elevators’ pits are being formed and poured.
    Northwest quadrant where concrete columns and elevators’ pits are being formed and poured.
  • Closer view of the southwest quadrant where partial of the second floor deck is being formed.
    Closer view of the southwest quadrant where part of the second floor deck is being formed.
  • Underpinning the Coca-Cola building.
    Underpinning the Coca-Cola building.
  • Spreading fill on the site.
    Spreading fill on the site.
  • Flag markers to locate the foundations.
    Flag markers to locate the foundations.
  • In late April, the 3rd level floor slabs and columns to support the 4 th floor were poured.
    In late April, the 3rd level floor slabs and columns to support the 4 th floor were poured.
  • The new courthouse aerial Taken in May 2013.
    The new courthouse aerial taken in May 2013.
  • Underpinning the Coca-Cola Building.
    ​Underpinning the Coca-Cola Building.
  • Gravel on site to be used for preparing the foundations.
    ​Gravel on site to be used for preparing the foundations.